math_celebrity Administrator Staff member Jul 14, 2024 #1 A road is resurfaced at the rate of 2 1/5 km per day. if it takes 9 days to complete the job, how long is the road? 2 & 1/5 = 11/5 9 / 11/5 is the same as 9 * 5/11 - 45/11
A road is resurfaced at the rate of 2 1/5 km per day. if it takes 9 days to complete the job, how long is the road? 2 & 1/5 = 11/5 9 / 11/5 is the same as 9 * 5/11 - 45/11